Abstract
Multi-product manufacturing scenarios today have to face many challenges considering external factors such as availability of resources or attending product demands and internal factors such as adjustment of buffer levels or utilisation of workstations. In this paper, a multi-product job shop consisting of workstations coupled by an unidirectional material flow with different production routings is considered. The existing model based on the bond graph technique is adapted to an optimal control problem, allowing the applicability of the Model Predictive Control scheme. Concerning performance criteria, two different objective functions are defined: the first aims for predefined processing frequencies of the workstations and the second one takes into account product demands. Both approaches were examined in simulations showing that a steady state is achieved in terms of stable buffer levels and processing frequencies.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.