Abstract

This study considers the problem of job scheduling on unrelated parallel machines. A multi-objective multi-point simulated annealing (MOMSA) algorithm was proposed for solving this problem by simultaneously minimising makespan, total weighted completion time and total weighted tardiness. To assess the performance of the proposed heuristic and compare it with that of several benchmark heuristics, the obtained sets of non-dominated solutions were assessed using four multi-objective performance indicators. The computational results demonstrated that the proposed heuristic markedly outperformed the benchmark heuristics in terms of the four performance indicators. The proposed MOMSA algorithm can provide a new benchmark for future research related to the unrelated parallel machine scheduling problem addressed in this study.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.