Abstract

Electrochemical chloride extraction (ECE) is one of the effective methods to remove chloride and prolong the service life of reinforced concrete (RC) structures. To fully understand the mechanisms of the long-term chloride ingress and subsequent ECE treatment of RC structure, a multi-phase mesoscopic numerical model is proposed. Unlike most of existing models, the long-term chloride ingress and the effect of chloride binding are considered in the proposed model, and the transport of chloride is simulated through a novel diffusion-migration-reaction process. The numerical simulation results show that the adsorption capacity of concrete to chloride decreases with the increase of chloride ingress time. Interestingly, the free chloride concentration on the surface of concrete decreases dramatically, and the maximum value appears in the concrete protective cover after ECE treatment. Furthermore, ECE treatment time, current density and concrete protective cover have significant influences on ECE treatment efficiency. Besides, the quantitative relationship models between these factors and ECE treatment efficiency have been developed. Moreover, the use of stirrup can improve the efficiency of ECE treatment. The research outcomes reveal previously ignored fundamental aspects of the ECE treatment and provide insights for the durability prediction of RC structures.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.