Abstract
Aiming at the problem that the downtime is simply assumed to be constant and the limited resources are not considered in the current selective maintenance of the series-parallel system, a three-objective selective maintenance model for the series-parallel system is established to minimize the maintenance cost, maximize the probability of completing the next task and minimize the downtime. The maintenance decision-making model and personnel allocation model are combined to make decisions on the optimal length of each equipment’s rest period, the equipment to be maintained during the rest period and the maintenance level. For the multi-objective model established, the NSGA-III algorithm is designed to solve the model. Comparing with the NSGA-II algorithm that only considers the first two objectives, it is verified that the designed multi-objective model can effectively reduce the downtime of the system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Advances in Production Engineering & Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.