Abstract
This paper presents Multi-objective Optimal Placement of Phasor measurement units (MOPP) to improve the performance of power system monitoring and control. It is proposed for achieving complete observability with a minimal number of phasor measurement units (PMUs) and maximising the voltage stability level of the system, simultaneously. As the above mentioned objectives are conflicting in nature, a fuzzified binary artificial bee colony algorithm is considered to solve the MOPP problem to offer a good tradeoff solution between the competing objectives. Here, fuzzy membership for each objective function is designed and proposed to decide the best solution of MOPP problem. Initially, weak buses are identified using the fast voltage stability index calculation for their close and reliable monitoring. This is done in order to prevent the outage of these buses. The conventional rule is used to minimise the number of PMUs and a new rule is proposed to maximise both the observability and voltage stability levels of the system. The efficiency of the artificial bee colony method is validated on IEEE 14, 30 and 57 bus test systems and it is verified by comparing the performance of proposed method with earlier works.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Experimental & Theoretical Artificial Intelligence
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.