Abstract
The aim of this study was to develop a multi-objective mathematical programming model for the trade-off of time, cost, and quality in the project-scheduling problem (PSP) by taking priorities and resource constraints as well as activity preemption into account. First, a small-sized problem instance that was a sub-project of an oil and gas construction project was used for te validation of the proposed model and algorithm. Subsequently, considering the sensitivity, complexity, and importance of oil and gas projects, the proposed model was implemented in a large-sized oil and gas construction project. Considering the NP-hardness of this problem, the NSGA-II metaheuristic algorithm was used to deal with the time, cost, and quality trade-off problem. Finally, a sensitivity analysis was implemented on the three main parameters of time, cost, and quality to investigate the effects of changes on the results. The findings show that the proposed model is more sensitive to cost changes, so an increase in project costs leads to a drastic change in the values of other objective functions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.