Abstract

Production and distribution are critical components of the furniture supply chain, and achieving optimal performance through their integration has become a vital focus for both the academic and business communities. Moreover, as economic globalization progresses, distributed manufacturing has become a pioneering production technique. Via leveraging a distributed flexible manufacturing system, mass flexible production at lower costs can be achieved. To this end, this study presents an integrated distributed flexible job shop and distribution problem to minimize makespan and total tardiness. In our research, a set of custom furniture orders from different customers are processed among flexible job shops and then delivered by vehicles to customers as the due date. To distinctly show the presented problem, a mixed integer mathematical programming model is created, and a multi-objective brain storm optimization method is introduced considering the problem's features. In comparison to the other three advanced methods, the superiority of the algorithm created is showcased. The findings of the experiments demonstrate that the constructed model and the introduced algorithm have remarkable competitiveness in addressing the problem being examined.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.