Abstract
During outages, Distribution Operation Centers establish a restoration plan to isolate the area that is probably faulty and reconnect all functioning components of a feeder. Despite all technological advances made in the last few decades, the final step to locate the faulty point is taken visually by repair field crews based on a patrol sequence. There is a lack of procedures to determine patrol sequences in literature, which is usually performed by the repair crew itself. Therefore, this paper offers an introduction to define patrol sequences in a multi-objective context. Furthermore, the Multi-Objective Discrete Particle Swarm Optimization has been proposed by using the 3-Opt algorithm and initialization heuristics based on an RNN algorithm - MODPSO+RNN+LS(3-Opt)-, which emulates the decisions made by the repair crew in the field. Lastly, the MODPSO+RNN+LS(3-Opt) was evaluated based on the IEEE 37-node and 123-node test feeders. The obtained results cast light upon how the initialization heuristics and local search method improve the final set of patrol sequence. In addition, it is also possible to find how the multi-objective context of the problem increases its complexity and how likely decisions that are typically made by the field repair crew could be improved by an optimization technique.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.