Abstract

This paper develops a multi-agent system based on auction and critical chain (MAS/AC) for decentralised resource constrained multiple project scheduling problem (DRCMPSP). In this system, parallel projects are to be scheduled simultaneously under the consideration of multi-objectives, where the allocation of global resources is independent from the allocation of activities and local resources through a multi-agent system. The critical chain method (CCM) is applied to adjust the schedule and local resource constraints of each single project. Subsequently, multiple objectives of different projects are considered in the process of calculating bid price. Moreover, the distribution of global resources is conducted by AA employed combinatorial auction. Through the interactive communication between AA and PAs, parallel projects could be scheduled simultaneously with respect to their different characteristics and interests, and the benefits of the whole system could be ensured meanwhile. An experimental example together is applied to demonstrate the efficiency and superiority of MAS/AC.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.