Abstract
To improve the effective planning of electricity-gas integrated energy systems (EGIES) among various stakeholders with distinct interests, a multi-agent game based joint long-term planning approach considering wind power uncertainty is proposed in this paper. First, the planning profit models of individual stakeholders are constructed. Then, the robust optimization approach is employed to deal with uncertainties of wind power outputs, and a virtual player ”nature” is introduced to represent uncertainties in the game process. Moreover, based on the analysis of the game mechanism among various stakeholders, a bi-level dynamic game based planning model for EGIES is proposed, conducting security checks through an integrated electricity-gas energy flow model. Finally, the proposed planning model is solved by an iterative search algorithm. Simulation results illustrate superiority of the proposed approach via two aspects: first, it guarantees the equity and provide fair profit allocation of all players in the game; second, it ensures security of the integrated energy system by effectively mitigating violations on voltage and nodal gas pressure limits.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.