Abstract

A simple procedure is proposed to identify line layout solutions when a production facility with work centres of unequal size uses conventional material handling devices and operates under stochastic demand scenarios. The procedure uses Monte Carlo simulation (MCS) to empirically search for robust solutions defined as those that simultaneously meet minimum material handling cost performance levels across all demand scenarios. The results reported in this study suggest that ‘robust’ line layout solutions can be identified using a modest volume of random sampling. The procedure and results are demonstrated through a series of sample problems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call