Abstract

A continuous time dynamic model of scheduling problems for a large class of manufacturing systems is considered. The realistic manufacturing based on multi-level bills of materials, flexible machines, controllable buffers and deterministic demand profiles is modeled in the canonical form of optimal control. Carrying buffer costs are minimized by controlling production rates of all machines that can be set up instantly. The maximum principle for the model is studied and properties of the optimal production regimes are revealed. The solution method developed rests on the iterative approach generalizing the method of projected gradient, but takes advantage of the analytical properties of the optimal solution to reduce significantly computational efforts. >

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.