Abstract
On the base of summarizing and contrasting the objectives of sequencing problem in mixed model assembly lines (MMAL) , and in consideration of the influence sequence-dependent setup times , a objective is proposed to minimize the total unfinished works and idle times over all jobs and stations . And the corresponding model is presented. To solve this model, a modified genetic algorithm is proposed to determine suitable sequences. Comparing with the Lingo 9 software, the proposed GA turns out to have a good ability to solve the sequencing problems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.