Abstract

Unpredictable transaction requirements of IT business lead to miss design the right size of data center. Over design data center contributed to surplus capital investment and lifetime operations. Legacy data centers designed before the 2ndmillenniums over design capacity more than 60% of actual load. The research objectives are created a model transformation approach from legacy data center to mobile and modular data center M2DC and proposed multivariate optimization for the right sizing of data center as business needs by using case study. The research method is investigation and assessment through 21 sample data centers and in-depth interviews with IT managers (32) and data center consultants (8). The fact findings have shown the standardized modular of M2DC force requirements to fit in the building boxes and expansion as needs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.