Abstract

This paper defines and evaluates a model predictive control strategy with binary integer programming optimization for load shifting in a water pumping scheme. Both time-of-use and maximum demand charges are considered in the control model. The control model yields near optimal switching times which reduce time-of-use and maximum demand based electricity costs. Both the time-of-use and maximum demand charges have a significant effect on the optimal switching times.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call