Abstract

Scheduling is one of the most important functions in managing industrial production. This article deals with the scheduling for the flow-shop production system planning by presenting a model that uses the framework of multiple criteria and multiple constraint levels ([Formula: see text]) linear programming, aiming at advancing the adaptation of the model to the situation when there are more than one decision makers in the system. At first, a flow-shop production system planning model with multiple constraint levels is proposed considering fluctuation in resource constraints such as the investment constraint and time constraint. Then, an improved algorithm is proposed. Finally, an example about production scheduling of an actual production is given, and the computational results are presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.