Abstract

Maintenance of offshore wind power plants is known to be extensive and costly. This paper presents a model for optimizing the maintenance support organization of an offshore wind farm: the location of maintenance accommodation, the number of technicians, the choice of transfer vessels, and the use of a helicopter. The model includes an analysis of a transportation strategy using alternative transportation means, a queuing model of maintenance activities, and an economic model of the maintenance support organization. An example based on a generic 100 wind turbine 5-MW wind farm is used to demonstrate the application of the model. The results show the benefit of the production losses of the different options, which enables the identification of an optimal maintenance support organization based on the reliability, logistic costs, and electricity price. The most cost-efficient maintenance support organization in the case study consists of an offshore accommodation with technicians on service 24 hours a day, 7 days a week. The solution suggests transportation by use of a crew transfer vessel equipped with a motion compensated access system.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.