Abstract

The move to integrating distribution management system (DMS) and feeder management system (FMS) in China is becoming the main trend in recent years, in addition to upgrading and rebuilding existing energy management system (EMS) and DMS. However, with increasing complexity in the social environments along with rapidly changing technologies, how to select a suitable contractor and a FMS project is becoming an important issue for electric power companies. This paper first briefly introduces FMS and then lists its critical success criteria. A model that applies a multi-criteria decision-making (MCDM) method, an analytic network process (ANP) associated with benefits, opportunities, costs and risks (BOCR), is constructed to help power companies to select the most suitable FMS project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.