Abstract
Proper sequencing between activities has always been one of the major issues in project management. Sometimes it is needed to redo some activities especially in product development projects. It is assumed that one of the reasons for reworking some activities and backward can be due to the incompleteness of the information needed when doing them, and also assumed that having complete information requires cost. In this article, a network of activities is considered, which may require a duplication of the process due to the interdependence of information between them. In this paper, using the design structure matrix concept and interdependence between activities, a two-purpose model for determining the proper sequence of activities have been provided to minimize the length of feedback and reduce the cost of completing the information using matrix concept. To accurately solve this model, the combination Lexicographic and Augmented Epsilon Constraint is used to obtain the Pareto National Front, which shows an increase in the cost of reducing the degree of dependence between activities for reducing the feedback length between activities. From the Pareto front, the best answer was chosen in a way that, based on the economic justification of the project, the percentage of reduction in the feedback length would be higher than the percentage increase.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.