Abstract

In this paper, we consider the problem of scheduling on a one-machine, a set of operations subject to unequal release dates with respect to the total completion time. This problem is known to be NP-hard in the strong sense. We propose an algorithm based on a Mixed Integer Linear Programming. This algorithm includes the implementation of a preprocessing procedure together with the consideration of valid inequalities. A computer simulation to measure the performance of the algorithm shows that our proposed method outperforms state-of-the-art branch-and-bound algorithms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.