Abstract

We model and solve the problems of preemptive scheduling of n independent jobs with release dates on m parallel machines with machine availability and eligibility constraints to minimize the makespan and maximum lateness as the minimum-cost network flow problem. We show that the approach can be extended to solve the corresponding scheduling problems on two uniform parallel machines.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.