Abstract
The scheduling of multiple products through pipelines, to meet a demand over a considered time horizon, is a challenging problem that many researchers have been interested in. Although pipelines are considered mainly in the petroleum industry, they can also be used in other industries. This paper deals with the multiproduct pipeline network scheduling problem in the context of mining industry. The objective is to schedule a sequence of batches, to be transported through the pipeline network, to ensure all product demand, while respecting the different technical constraints. The proposed approach is a MILP model with a continuous representation of time and batch volume. It provides maximizes the volume of batches to satisfy all product demands. The model was tested using different instances over a short-term horizon.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.