Abstract
A Milp-Based Heuristic Algorithm for Coordinated Optimization between Maintenance Scheduling and Long-Term Unit Commitment for Hydrothermal Power Systems
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have