Abstract

One important issue in the mid to late development stages of oilfields is maintaining stable production, especially when the existing gathering pipeline system cannot fully satisfy the development of low pressures and low production rates. In these cases, it is necessary to restructure the original gathering pipeline system. In this study, an optimal design method is proposed to restructure a pipeline system in an oilfield in the mid to late development stages. Based on the demand of stable production and the existing structure of the pipeline system, a mixed-integer nonlinear programming (MINLP) model with an objective function that minimizes the total cost is developed. Hydraulic, technical and economic constraints are considered. The model is linearized based on a piecewise method and solved by the branch-and-bound algorithm. This method is applied to a real case study of a pipeline system in an oilfield.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.