Abstract

In order to implement the objective mix design of hot mix asphalt adequately during the construction process, the significance of objective mixing ratio was elaborated, and the variability of materials and its control method were analyzed. An engineering example is used to illustrate the debugging process of asphalt mixture batching & mixing plant and the dynamic quality management methods. The results show that the set of methods can not only implement the objective mixing ratio of hot mix asphalt adequately, but also control production during the construction process effectively.