Abstract
This paper presents an analytical-based methodology that computes the optimal length of block sections and the marker boards’ location following headway requirements, with the lowest amount of signalling equipment, for an ETCS L2 railway networks.It is applied to the Danish Fjernbane Infrastructure East project, which aims at replacing the existing signalling system with a new one based on ETCS Level 2. Starting from track layout, rolling stock information and headway scenario, and knowing the trains features, an easy backward calculation, using OpenTrack tool, defines the first signalling equipment position (i.e. Marker Boards, Axle Counter) to fulfil the headway requirements.The application to the main passenger and freight lines in Danish Fjernbane Infrastructure East area shows the significance of the proposed methodology able to define a robust signalling configuration which also provides a satisfying trade-off between total cost and railway operational performance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Rail Transport Planning & Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.