Abstract
The assessment of an energy retrofit necessarily requires an energy measurement campaign before (base year energy consumption) and after (post retrofit energy consumption) the retrofit. Only in this way is it possible to reach a safe conclusion, on the true retrofit impact. In addition, a number of adjustments are necessary to secure that the retrofit impact on energy consumption is effectively isolated, i.e., which we report on the true retrofit impact and not, for example, on external variations, such as a more mild winter. This paper introduces a conceptual framework for taking account, in the retrofit impact assessment, of three external parameters: weather, indoor comfort and space occupancy. The broader strategy behind this work is to develop a comprehensive methodology that would allow a cost efficient, fast and accurate assessment of energy retrofits in buildings. This would allow insight, on the investor side, as to the prudence of his investment and, and in this way, could help the proliferation of the practice of energy retrofits. The adjustment methodology, introduced here, is a first step in this direction.
Highlights
IntroductionBuilding retrofits are an important activity in the construction industry
Building retrofits are an important activity in the construction industry. They may be initiated for many reasons, one of which is the reduction of energy consumption
We have presented above a conceptual framework for managing and carrying out adjustments when trying to assess the impact of a retrofit
Summary
Building retrofits are an important activity in the construction industry. They may be initiated for many reasons, one of which is the reduction of energy consumption (energy retrofits). How to cite this paper: Sakkas, N. and Kaltsis, E. (2014) A Methodology for Introducing M&V Adjustments during an Energy Retrofit Impact Assessment. Kaltsis the lack of data backed evidence on the retrofit impact does not allow the building owner to gain insight in his investment. It does not allow the retrofit provider to fully understand his solution limitations and launch continuous improvement strategies
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.