Abstract

Abstract Unexpected ground conditions have always been a major problem for the tunnelling industry. As demand for the development of new underground structures, regardless of the ground conditions, has increased, safety and risk considerations have become even more important. The methodology presented in this paper aims at the identification of risk-prone areas, incorporating, at the same time, the uncertainty of ground conditions. It is focused on TBM tunnelling and can be implemented in the early stages of the project. The methodology assesses the hazards by introducing the concept of a vulnerability index, which is based on the principles of rock engineering systems, to identify the weighting of the parameters, and on probabilistic modelling to address the uncertainty in the parameters’ values. The proposed model is illustrated via the Athens Metro case study, used also for validating its performance under actual construction conditions.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.