Abstract

The time-delay in a networked control system is difficult to predict accurately. In order to improve prediction performance, a time-delay prediction method is proposed. Firstly, the approximation components with low-frequency and approximation components with a high frequency of time-delay sequence are obtained through the decomposition and reconstruction of Db3 (Daubechies 3) wavelet transform. Secondly, the characteristics of the approximate component and detail components are analyzed. Fractal autoregressive integrated moving average (FARIMA) is chosen as the prediction model for an approximate component. Autoregressive integrated moving average (ARIMA) is chosen as the prediction model for detail components. Finally, the final prediction value can be obtained by the prediction value of FARIMA adding the prediction value of ARIMA. The proposed prediction method combines the advantages of FARIMA and ARIMA. The case study results show that the proposed prediction method has better prediction accuracy.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call