Abstract
The high-speed railway is a typical ground systems, if subjected to a larger GIC, will lead to serious incidents. For the power supply and wiring pattern of high-speed railway is different from the public grid, then how to monitor the GIC impact on the high-speed rail electrical systems need to be studied. The paper study the process and pattem of GIC in high-speed rail track circuit, and propose a signal acquisition method of GIC in the track circuit. The sampled signal will be go through the low-pass filter designed by the window function to obtain the GIC.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.