Abstract

Project portfolios represent the bridge between projects and strategy. However, the final results may not be as expected because materialization of risk factors. Hence, literature has acknowledged project portfolio risk assessment as an element of the project portfolio risk management, being the element that provides information on the importance of risk factors. For that, some specific characteristics should be considered, such as risk interdependency influence and the risk factors impact over portfolio higher levels. Thus, this study is focused on the development of a method for project portfolio risk assessment that considers both risk factor interdependencies and their impact on the strategic objectives as a network. In addition, the method also allows incorporating both risk factors derived from projects and derived at project portfolio level. A representative example is provided to illustrate the proposed method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.