Abstract
This paper addresses the simply stated but important question: If a utility has decided to install a number of arrays of wind turbine (WT) generators, how should they be operated and controlled on the load frequency control time-scale- seconds to minutes?
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have