Abstract

The common information model (CIM) is crucial to the Smart Grid. However, its updates always cause the unmatched data mapping and model ontology confusion among integrated systems because of the ambiguous and unintuitive CIM update processes. The CIM meta-model was specifically designed to solve these problems. Its XSD-based ontology consisted of basic modeling steps and process information that bridged the gap among CIM UML/RDFS/RDF in compliance with the IEC 61968 standard. The corresponding scheme and application scenarios also presented to support the novel model transformation between different versions of the CIM for data integration.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.