Abstract

In this paper, we propose a metaheuristic for solving an original scheduling problem with auxiliary resources in a photolithography workshop of a semiconductor plant. The photolithography workshop is often a bottleneck, and improving scheduling decisions in this workshop can help to improve indicators of the whole plant. Two optimization criteria are separately considered: the weighted flow time (to minimize) and the number of products that are processed (to maximize). After stating the problem and giving some properties on the solution space, we show how these properties help us to efficiently solve the problem with the proposed memetic algorithm, which has been implemented and tested on large generated instances. Numerical experiments show that good solutions are obtained within a reasonable computational time.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.