Abstract

• New mathematical programming model for extending MRP systems. • Integrating procurement transport and production planning decisions. • Validation with real world data from an automobile company. • Improvement of the current heuristic procedure in the studied company. In this paper, we propose a new mathematical programming model for integrating production and procurement transport planning decisions in manufacturing systems in a unique optimization model. This problem was introduced conceptually and dubbed as MRP IV by Díaz-Madroñero et al. (2012) to extend the current MRP (material requirement planning) systems. This proposal simultaneously considers material, production resources capacities and procurement transport planning decisions with different shipping modes (such as full-truckload, less-than-truckload and milk-run) in the supply chain to avoid suboptimal results, which are usually generated due to sequential and independent plans. We considered an industrial automobile company to validate the proposed model using real world data. The results obtained by the MRP IV proposed model, in terms of total planning costs and transport efficiency indicators, are better than those obtained in the current heuristic procedures followed in the company under study.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call