Abstract
This paper examines an important scheduling problem resulting from a new process for continuously casting steel. A master slab caster produces slabs which are wider than customer needs, and therefore, these must be ripped longitudinally at least once before they can be processed to a customer-specified width. The purpose of this research is to develop an effective and efficient algorithm for combining customer sizes in order to economically schedule the ripping process. Such a solution procedure could be used to assist decision-makers in selecting master slab widths for production and in designing width limitations for future casters. The method entails more than the minimization of trim loss because other costs are relevant. Mathematical programming is used to arrive at an optimal or near-optimal solution to this production management problem. The results indicate that the procedure described in this paper reduces to total costs dramatically.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.