Abstract

AbstractIn this work, we proposed a two‐stage stochastic programming model for a four‐echelon supply chain problem considering possible disruptions at the nodes (supplier and facilities) as well as the connecting transportation modes and operational uncertainties in form of uncertain demands. The first stage decisions are supplier choice, capacity levels for manufacturing sites and warehouses, inventory levels, transportation modes selection, and shipment decisions for the certain periods, and the second stage anticipates the cost of meeting future demands subject to the first stage decision. Comparing the solution obtained for the two‐stage stochastic model with a multi‐period deterministic model shows that the stochastic model makes a better first stage decision to hedge against the future demand. This study demonstrates the managerial viability of the proposed model in decision making for supply chain network in which both disruption and operational uncertainties are accounted for.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.