Abstract
Given that material handling in manufacturing systems is very important, many organisations use automatic guided vehicle (AGV). In recent years, many organisations have intended to have access to an optimal scheduling plan for their manufacturing and transportation system. For this reason, a mathematical model is proposed in this study for scheduling of the production process and AGV's allocation. Production time in any process, setup time, loaded/unloaded trip duration, parking spaces, and the discharge time and loading of products at each workstation are considered in the proposed model. Finally, a numerical example is used to explore the proposed model and it will be solved using GAMS software.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Engineering Systems Modelling and Simulation
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.