Abstract

This paper reviews the design features and performance characteristics for a large bore (90 mm) barrel system fabricated for the Defence Research Agency (DRA) to operate at the Kirkcudbright Electromagnetic Launch Facility. This 90 mm barrel was designed for testing developmental launch package designs. The barrel design permits the rapid refurbishment of bore insulators and rails that are commonly damaged by launch package failures during development testing. The barrel system is designed for operation with both plasma and metal armatures up to peak current levels of 3.5 MA. The results of initial performance testing including inductance gradient and bore deflection are presented. >

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.