Abstract

Hydro unit commitment is the problem of maximizing water use efficiency while minimizing start-up costs in the daily operation of multiple hydro plants, subject to constraints on short-term reservoir operation, and long-term goals. A low-rank rounding heuristic is presented for the semidefinite relaxation of the mixed-integer quadratic-constrained formulation of this problem. In addition to limits on reservoir and generator operation, transmission constraints are represented by an approximate AC power flow model. In our proposed method, the mathematical program is equivalently formulated as a QCQP problem solved by convex relaxation based on semidefinite programming, followed by a MILP solution of undefined unit commitment schedules. Finally, a rank reduction procedure is applied. Effectiveness of the proposed heuristic is compared to branch-and-bound solutions for numerical case studies of varying sizes of the generation and transmission systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.