Abstract

The importance of reducing product lotsizes in converting traditional job shops into just‐in‐time (JIT) type manufacturing systems has been addressed in the literature. This paper presents a lotsize reduction model for closed stochastic production systems. The model is formulated based on an M/G/c queuing lotsize model. Product lotsize choice is related to all major components of job flow time: waiting time in queue, batch processing time, batch moving time, and finished goods warehousing time. The research is motivated by the fact that an optimal lotsize solution that minimizes only average job waiting time in the shop may not be optimal when the effects of job batch processing time, batch moving time, and batch warehousing time are also considered. There is no general closed form solution to the model due to the complexity of its nonlinear formulation. Based on the unique properties of the model, heuristic solution procedures are developed. The research demonstrates opportunities for shop managers to significantly reduce product lotsizes while minimizing total operating cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.