Abstract
Flexible pavements are often rehabilitated by milling distressed asphalt and placing new asphalt at a thickness that accounts for expected traffic growth and pavement life. However, there are many reported benefits to concrete overlays as a method to rehabilitate and preserve distressed asphalt pavements. In 1988, the Florida Department of Transportation designed and constructed an unbonded concrete overlay on US-1 between Daytona Beach and Titusville. The 1.9-mile concrete overlay was part of a larger 8-mile milling and resurfacing of a deteriorated asphalt pavement. The concrete overlay test sections were divided into three groups based on design thicknesses of 6, 7, and 8 inches. Each of these groups included subsections with three joint spacing levels and two dowel bar configurations consisting of standard 12-inch spacing and wheel path only. The overlay sections are still in service with no major rehabilitation effort. The primary distress is pavement roughness found in sections with wheel path dowels only. The section with the most cracked slabs had joint spacings of 20 ft, which is no longer recommended. This paper documents the experimental program and presents the analysis and findings.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Transportation Research Record: Journal of the Transportation Research Board
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.