Abstract
A mathematical model, based upon the application of a linear-integer programming algorithm, is presented for the optimum selection of independent electric power generation schemes in industrial power systems, taking into account reliability considerations. The problem is formulated as a mathematical programming problem, considering investment costs, fuel costs, operation and maintenance costs, power balance, maximum and minimum limits on the generated power of the units, as well as reliability considerations such as the unavailability of the generation scheme. These considerations include assumptions taken and simplifications performed in order to obtain an accurate enough linear model. The problem is solved using a conventional branch and bound algorithm for linear-integer programming, yielding to the optimum number of units, as well as the correspondent size and type. Results are presented for the application of the proposed methodology to a real case of an industrial power system. The technique is proved as a valuable tool for the planning engineer.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.