Abstract

For the vacuum preloading foundation treatment project, water covering construction is often carried out during vacuum pumping. It is very inconvenient for the monitoring personnel to measure the readings in the water with layered settlement instruments and equipment. This paper introduces an assembly method of foundation layered settlement monitoring device, including the assembly process of the monitoring device itself and the assembly process of embedding the monitoring device in the foundation. It has the advantages of simple structure, simple installation and stable data. It can realize the in-situ monitoring of different foundations, save manpower and material resources, and greatly improve the monitoring efficiency and accuracy.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call