Abstract

Two-sided assembly lines are widely applied to produce the large-sized high-volume products, such as buses and trucks. Balancing the lines is a vital design problem for the industries, and the problem is NP-hard. Besides the fundamental constraints of the conventional line balancing problem, some specific constraints may occur in the two-sided assembly line problem, including the zoning constraints, the positional constraints, and the synchronism constraints, which make the problem more complex. In this paper, an integer programming (IP) model is constructed and solved for the two-sided assembly line balancing problem which contains the above three constraints. A novel metaheuristic named late acceptance hill-climbing (LAHC) is also proposed to solve the problem effectively. The proposed algorithm is tested on several sets of instances. The computational results of the LAHC algorithm are compared with those of IP and the lower bounds of the instances. The experiment validates the effectiveness of the LAHC algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.