Abstract

The Gongbei Tunnel, the most important and difficult part in Zhuhai Link of Hong Kong-Zhuhai-Macao Bridge, faces numerous troubles because of natural and human-related factors. A new pre-supporting technique, Freeze-Sealing Pipe Roof method, which combines Pipe-Roofing Method with Artificial Ground Freezing method, has been put forward and employed for the first time in China during the construction of the Gongbei Tunnel. An innovative freezing scheme is proposed by three kinds of freezing tubes (master, enhancing and limiting tubes) to cope with various conditions. A large-scale physical model test has been conducted so as to validate the freezing effect of Freeze-Sealing Pipe Roof method. The present paper focuses on the experimental set-up and results in detail, which confirms safety and rationality of the freezing scheme.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call