Abstract

• We introduce a new single-machine scheduling problem involving two classes of jobs. • The objective is to balance the average weighted completion times. • We show the NP-hardness of the problem. • We solve the problem by a Lagrangian relaxation heuristics. • Numerical results are presented on a set of randomly generated test problems. We tackle a new single-machine scheduling problem, whose objective is to balance the average weighted completion times of two classes of jobs. Because both the job sets contribute to the same objective function, this problem can be interpreted as a cooperative two-agent scheduling problem, in contraposition to the standard multiagent problems, which are of the competitive type since each class of job is involved only in optimizing its agent's criterion. Balancing the completion times of different sets of tasks finds application in many fields, such as in logistics for balancing the delivery times, in manufacturing for balancing the assembly lines and in services for balancing the waiting times of groups of people. To solve the problem, for which we show the NP-hardness, a Lagrangian heuristic algorithm is proposed. In particular, starting from a nonsmooth variant of the quadratic assignment problem, our approach is based on the Lagrangian relaxation of a linearized model and reduces to solve a finite sequence of successive linear assignment problems. Numerical results are presented on a set of randomly generated test problems, showing the efficiency of the proposed technique.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call