Abstract

ABSTRACTLaboratory experiments were conducted to study the factors that influence the successful placement of cement and resin plugs using thru-tubing dump bailers. The five-phase study included: (1) cement slurry design, (2) full-scale visual tests, (3) full-scale cured plug tests, (4) shear bond tests, and (5) gravel pack penetration tests.This paper presents results from the test program and provides data on commonly used dump bailer practices and equipment. Recommendations are made for placing cement and resin plugs utilizing dump bailers. This information should be useful to operators in planning and completing successful thru-tubing plugbacks.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.