Abstract

ABSTRACT We present a knowledge—based multiobjective project scheduling system which handles a class of nonpreemptive scheduling problems characterized by (i) renewable, nonrenewable and doubly—constrained resources of many types, (ii) multiple performing modes of tasks and (iii) multiple project performance measures. Knowledge concerning different aspects of technology, resources and schedules is stored in several knowledge sources which are separated and communicate through a blackboard. The knowledge is represented by production rules and frames. Rules operate on objects (represented by frames) which instances are stored in the blackboard.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.