Abstract

In the production scheduling of industrial processes, there are various uncertainties, and the uncertainty of processing time is the most typical one. In this paper, the uncertainty of processing time is described as triangle fuzzy numbers, and the scheduling model for flow-shop processing under uncertainty is established based on the fuzzy programming theory. The fuzzy programming is converted into distinct single-objective programming by employing the two fuzzy operations given by Masatoshi et al. (1999) and the middle maximal membership algorithm presented by the authors (2000). The experimental study validates the efficiency of the proposed scheduling model and fuzzy optimization method, and the influence of the decision factor /spl Gamma/ is discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.